Qualified town planners · NSW, VIC, QLD & SA(02) 7238 0808Get the checklist
Free buyer's guide · 7 pages

The planning checks smart buyers make before they sign

A contract review tells you about the title. It does not tell you whether you can extend, add a granny flat or subdivide. This checklist covers the planning questions your conveyancer won't answer for you, across NSW, Victoria, Queensland and South Australia.

Six universal checks that apply to every property in every state
A dedicated page per state — the exact certificates, portals and overlays to pull
The honest limits of DIY research, and what a planner resolves that mapping can't
98%Approval rate on applications that use our reports
4,000+Approvals supported
300+Councils covered
48–72hrReport turnaround
Free downloadThe Pre-Purchase Planning Due Diligence Checklist7-page PDF · NSW, VIC, QLD, SA
We email the PDF straight away and occasionally send planning updates for your state. Unsubscribe any time.
Written by the planners and ex-council officers who prepare Planna's reports.
Why it matters

The information was public the whole time. Nobody checked it.

Almost every planning disaster we see follows the same pattern: the buyer assumed the property could do something, and the planning controls said otherwise. None of it appears on a title search or a standard contract review.

After settlementThe granny flat is not permitted

Minimum lot sizes, frontage rules and zone land-use tables decide whether a second dwelling is even on the table. The agent's “granny flat potential” is not an assessment.

After settlementAn easement sits under your extension

Drainage easements and sewer mains regularly run through the exact part of the block a buyer planned to build on. Utility authorities do not move infrastructure to suit a renovation.

After settlementAn overlay blocks the renovation you bought it for

Conservation areas, character controls and environmental overlays restrict demolition, extensions and even materials — on ordinary-looking homes, not just listed ones.

What's inside

Seven pages. No filler.

Work through the universal checks, then turn to your state. Tick what you have confirmed in writing. Whatever is left is your due diligence list.

Get the checklist
P.02
The six universal checks

Zoning, overlays and constraints, easements and covenants, lot dimensions against your plans, existing approvals and unauthorised works, and what is planned around you.

P.03
New South Wales

The Section 10.7 certificate, LEP zoning and minimum lot size, bushfire and flood mapping, heritage and conservation areas, and whether the fast-track CDC pathway is open to you.

P.04
Victoria

The Planning Property Report, what the Section 32 does and does not tell you, reading each overlay individually, permit triggers, and the single-dwelling covenants that override good zoning.

P.05
Queensland

Scheme zoning and precincts, whether your project is accepted, code assessable or impact assessable, flood mapping, character and heritage overlays, and hazard controls.

P.06
South Australia

The planning atlas, identifying your assessment pathway under the Planning and Design Code, heritage and character overlays, hazard overlays, and minimum site areas.

P.07
The honest bit: what a checklist can't do

Where DIY research stops, why interpretation is a planner's job, and a side-by-side of the questions a checklist answers versus the ones a report does.

Checklist vs report

Public mapping tells you which rules apply. It doesn't tell you what they mean.

The first part is public. The second part is professional judgement — and it is the part your purchase decision actually turns on.

QuestionThis checklistA Planna PPR
What zone and overlays apply?Yes, via public mappingYes, verified by a planner
Can I build my specific project here?NoYes, assessed against the controls
Which approval pathway applies?NoYes, including fast-track feasibility
What are the risks and how do I manage them?NoYes, with recommendations
Is this site worth the price for my plans?NoInformed answer before you sign
Order a PPR from $1,10048 to 72 hour turnaround · around 70% less than standard town planning firms
Straight answers

What buyers ask us first

Yes. The checklist is a 7-page PDF and costs nothing. We ask for your name, email and state so we can send it and tailor the occasional planning update to where you are buying.

Get the checklist before your next inspection

Free, 7 pages, no obligation. If the checklist raises a question you can't answer yourself, that is exactly what a Preliminary Planning Report is for.

Already know you need answers?
From A$1,100Preliminary Planning Report, delivered in 48 to 72 hours
Zoning, permissibility and overlays verified for your address
Feasibility of your specific project and the fastest pathway to approval
Written recommendations you can act on, or walk away on
See what a PPR covers